RBK-15 A, J, EA and EJ series, 5/8" rod diameter, rod bearing kit (Buna N seals)
- Lead Time:
11+ Days Lead to Ship
|
$27.79 |
|
$27.79 |
× |
V45AA11D-C313A V45 Series, 2x3/2 NC valve, sol/spring (24Vdc) without connector
- Lead Time:
14+ Day Estimated
|
$243.91 |
|
$243.91 |
× |
DSA-G06-C5-C115-E22 Pilot Operated Directional Control Valve
- Lead Time:
Call for current lead time
|
$514.22 |
|
$514.22 |
× |
DSA-G06-C5-C115-E22 Pilot Operated Directional Control Valve
- Lead Time:
Call for current lead time
|
$514.22 |
|
$514.22 |
× |
V45A511D-C313B V45 Series, 5/2 valve, sol/sol (24Vdc) with connector
- Lead Time:
40+ Days Lead to Ship
|
$325.10 |
|
$325.10 |
× |
DSA-G06-A3X-D2-E23 Pilot Operated Directional Control Valve
- Lead Time:
Call for current lead time
|
$464.86 |
|
$464.86 |
× |
Enter Coupon Code
|